siemens

Azad Engineering Opens Lean Manufacturing Facility for Siemens Energy in Hyderabad

Azad Engineering has inaugurated a 7,200 square metre lean manufacturing facility at its Centre of Excellence and Innovation Centre in Tunikibollaram, Hyderabad. The facility has been established to meet capacity commitments for Siemens Energy. The facility currently employs over 150 skilled professionals and is expected to scale up to around 230 by the end of […]

Siemens Energy Opens New Office and Engineering Centre in Bangalore

Siemens Energy has opened a new office in Bangalore, consolidating its local operations alongside the Siemens Gamesa office. The facility also houses the company’s Industrial Gas Turbine Service Centre, which provides services for its installed fleet in India, including full machine overhauls. The site includes a Global Engineering Centre for the company’s Transformation of Industry […]

Siemens Limited and Tata STRIVE Dual VET Program Benefits 120,000 Trainees Across 279 ITIs

Siemens Limited and Tata STRIVE have jointly implemented a Dual Vocational Education and Training (VET) program that has reached over 120,000 beneficiaries in 279 Government Industrial Training Institutes (ITIs) over the past eight years. The initiative, based on the German vocational training model, aims to better align ITI training with industry requirements. The program enhances […]

Siemens Lists Energy Business as Siemens Energy India Limited

Siemens AG has completed the demerger and separate listing of its energy business in India as Siemens Energy India Limited. The shares of Siemens Energy India Limited are now publicly traded on BSE Limited and the National Stock Exchange of India Limited. The restructuring establishes Siemens Limited India and Siemens Energy India Limited as two […]

Siemens Energy Opens HVDC Control and Protection Test Center in Gurugram

Siemens Energy has inaugurated a High Voltage Direct Current (HVDC) Control and Protection (C&P) Test Center in Gurugram, India, as part of its ongoing LCC (Line Commutated Converter) refurbishment initiative. The new facility will support the testing and implementation of the company’s Grid Flow PLUS control and protection system. According to the company, teams based […]

Indian Railways’ Dahod Facility Dispatches First 9000 HP Electric Locomotive Built in Collaboration with Siemens

The Indian Railways’ factory in Dahod, Gujarat, has dispatched the first of a planned series of 9000 horsepower (HP) electric freight locomotives, developed in collaboration with Siemens. The rollout follows the award of a contract to Siemens for the design, engineering, manufacturing, and maintenance of 1,200 such locomotives. The locomotive was flagged off by Prime […]

Siemens Energy India Signs Long-Term Maintenance Contracts with Torrent Power

Siemens Energy India Limited, a technology and services provider for the energy sector, has renewed its Long-Term Maintenance Contract (LTMC) for three 4000F gas turbines at Torrent Power’s SUGEN Mega Power Plant in Akhakhol, near Surat, Gujarat. Additionally, a new LTMC has been signed covering the plant’s steam turbines and generators. The SUGEN facility, commissioned […]

Siemens Energy’s Global Head Reviews Manufacturing Operations in India

Siemens Energy’s global head, Christina Schulte-Kutsch, recently visited India to review the company’s manufacturing operations and expansion efforts across multiple locations, including Kalwa, Vadodara, Naroda, and Gurgaon. In Kalwa, Schulte-Kutsch examined the ongoing expansion of the Transformers factory, which serves both domestic and international markets. The visit included a review of production capabilities and workforce […]

Siemens Introduces MACHINUM Digitalization Portfolio at IMTEX 2025

Siemens has launched MACHINUM, a digitalization portfolio aimed at enhancing efficiency and sustainability in the machine tool sector, at IMTEX 2025. According to a press release from Siemens, MACHINUM is part of the Siemens Xcelerator platform and offers solutions that could potentially reduce machine setup times by up to 20% and energy consumption by up […]